Worcester Park Conservatory 

For this project, we were asked by the client to convert an unusable conservatory into an insulated room they could use all year round. 
After the checking of foundations and existing walls, we were able to establish that we could use part of the current structure. Thus, saving a substantial cost and stress to the client. 
In addition to the rear works, we divided the existing kitchen to provide a pantry and utility room with WC. We refurbished the ground floor with new flooring, joinery, and decorating throughout. 
 
A new kitchen and first-floor bathroom were installed with underfloor heating provided to the kitchen area and the electrics updated to current regulations.. 
⭐️ ⭐️ ⭐️ ⭐️ ⭐️ 
June – September 2023 
 
“CW Building Solutions conducted a full new building spec which comprised a kitchen,  lounge and dining area and created a new utility/wc and a walk in pantry.  “ 
As a team, they are professional, well organised, tidy, always punctual, and kept us informed on a daily basis of the schedule of work, which took place over 3 months.   
A team who are also innovative that helped us to achieve the style of living that we were looking for ….. and we are delighted.” 
 
Mr and Mrs L, Worcester Park